IMPLEMENTATION OF MEDIUM VOLTAGE AUTOMATIC CHANGE OVER (ACO-MV) DEVICE AS POWER OUTAGE REDUCTION FOR PREMIUM CUSTOMERS AT PT PLN (PERSERO) UP3 KRAMAT JATI

##plugins.themes.academic_pro.article.main##

Oracle Bramantyo Wardhana
Rahmat Hidayat

Abstract

This qualitative research analyzes the implementation of the ACO-MV device in reducing power outages. The study aims to understand the experiences, perspectives, and impacts of the ACO-MV device on stakeholders, including premium customers, businesses, and industries. Using a qualitative approach, in-depth interviews are conducted with key stakeholders, such as PT PLN (PERSERO) UP3 Kramat Jati representatives, premium customers, and business owners. These interviews provide insights into their experiences and perspectives regarding the ACO-MV device. Observational studies and document analysis supplement the interview data, providing a comprehensive understanding of outage incidents, device operation, and maintenance procedures. Thematic analysis is employed to identify recurring themes, patterns, and insights related to the effectiveness of the ACO-MV device in reducing power outages and its impact on stakeholders. The research findings contribute to a deeper understanding of the qualitative aspects of the ACO-MV device's implementation, informing decision-making and potential improvements in its design, operation, and maintenance. The framework and dataset utilized in this study offer a robust foundation for analyzing stakeholder perspectives and experiences. This research helps advance the understanding of the ACO-MV device's impact on power outage reduction and supports informed decision-making processes.

##plugins.themes.academic_pro.article.details##

How to Cite
Wardhana, O. B. ., & Hidayat, R. (2022). IMPLEMENTATION OF MEDIUM VOLTAGE AUTOMATIC CHANGE OVER (ACO-MV) DEVICE AS POWER OUTAGE REDUCTION FOR PREMIUM CUSTOMERS AT PT PLN (PERSERO) UP3 KRAMAT JATI. TEKNOKOM, 6(2), 96–103. https://doi.org/10.31943/teknokom.v6i2.144

References

  1. G. P. CANDRA, "ENERGIZE PELANGGAN TEGANGAN MENENGAH PREMIUM GOLD DENGAN SKEMA SETTING AUTOMATIC CHANGE OVER," INSTITUT TEKNOLOGI – PLN, pp. 1-69, 2020.
  2. "OPTIMALISASI MENGURANGI DURASI PEMADAMAN PADA PELANGGAN PREMIUM DENGAN CARA PEMASANGAN AUTOMATIC CHANGE OVER (ACO) DI GARDU E225," INSTITUT TEKNOLOGI-PLN, pp. 1-58, 2020.
  3. PT. PLN (PERSERO)., "Standar Konstruksi Gardu Distribusi dan Gardu Hubung Tenaga Listrik", Jakarta, 2010.
  4. T. G. R. S. Bricker, "Substation automation technologies and advantages," IEEE, vol. 14, no. 3, pp. 31 - 37, 2001.
  5. S. C. B. S. Gheorghe Gheorghe Marius Deaconu, "The Testing of Digital Substation - an Important Issue in Power Engineering Education," IEEE, pp. 25-27, 2021.
  6. W. S. P. S. Ratno Wibowo, STANDAR KONSTRUKSI JARINGAN TEGANGAN MENENGAH TENAGA LISTRIK, Jakarta: PT PLN (PERSERO), 2010.
  7. Y. Badruzzaman and I.S. Astuti, "ANALISIS PERENCANAAN JARINGAN PELANGGAN PREMIUM CV. SN JAYA PRIMA DI PT. PLN (PERSERO) DISTRIBUSI AREA PURWOKERTO," in Proc. National Conference on Industrial Engineering and Technology (NCIET), 2020, pp.
  8. S. Andaresta, "PERENCANAAN PENAMBAHAN DAYA SERTA MENJADI PELANGGAN PREMIUM PT PLN (PERSERO) PADA PT SINAR ALAM PERMAI," in Proc. Eprints POLSRI, 2021.
  9. M. Hidayati, "PERENCANAAN PENYAMBUNGAN BARU PELANGGAN PREMIUM PADA PT SURYA BINTANG LESTARI OLEH PT PLN PERSERO UP3 PALEMBANG," in Proc. Eprints POLSRI, 2021. Available: [URL].
  10. A. Muzammil, B. Bakhtiar, and S. Thaha, "Analisis Peningkatan Pelayanan Suplai Rumah Sakit Hermina Makassar dengan Dua Penyulang Incoming," in Proc. 2023, pp.
  11. A.S. Budi, "… JARINGAN DISTRIBUSI PADA PREMIUM CUSTOMERS YANG DILENGKAPI DENGAN AUTOMATIC CHANGE OVER SWITCH BERBASIS ARDUINO MEGA 2560 …," in Proc. Eprints UNDIP, 2018.
  12. S. Sugianto and A.D. Mustikasari, "PEMASANGAN AUTOMATIC CHANGE OVER (ACO) UNTUK MENINGKATKAN KEANDALAN PADA PELANGGAN PREMIUM," Journal of Information Technology and Computer Science, vol. 3, no. 1, pp. 8-14, 2020. doi: 10.22441/jitkom.2020.v3.i1.008.
  13. S. Subianto, "PEMASANGAN ACOS (AUTOMATIC CHANGE OVER SWITCH) SUPPLY DUA PENYULANG UNTUK KEANDALAN SISTEM KELISTRIKAN DI KANTOR PT.PLN (Persero) RAYON SEKAYU," Jurnal Teknik Elektro.
  14. A. Ramadhan, "Implementasi Pelayanan Prima Studi Kasus Layanan Reguler Dan Layanan Premium Di Pt Pln Up3 Yogyakarta," in Proc. DSpace UII, 2022.
  15. A. Setiawan, "Pemeliharaan Jaringan Tegangan Rendah dan Tegangan Menengah,"
  16. A. Saadah dan M.I. Arsyad, "Studi Perencanaan Pembangunan Penyulang Baru untuk Pembagian Beban Penyulang Sahang 1 dan Raya 17 PT PLN (PERSERO) ULP Siantan,"
  17. R. Rizkifadhla, "Simulasi Pelimpahan Beban PMT Outgoing PWI 06 saat Terjadi Overload Shedding pada Trafo Incoming 03 Gardu Induk Purwodadi dengan Monitoring VT SCADA," 2019, [Online]. Available: http://eprints.undip.ac.id/77723/.

Most read articles by the same author(s)